The first day of most flooring jobs is spent taking a floor out, not putting one in. How long that takes depends almost entirely on what the old floor is and how it was fastened. Carpet can be gone in a morning. Tile set in a mortar bed can take far longer than the new floor will take to install.
Removal is also the moment the subfloor is exposed and the real condition of the room becomes clear, which is why it matters more than its place in the schedule suggests.
Why the old floor usually comes out
Laying new flooring over old is sometimes possible, and it is usually a false economy. Every layer raises the floor, which affects how doors swing, how the floor meets the next room and how appliances fit back under counters. And a floor laid over an old one is only as flat and sound as the floor beneath it, with nobody having seen the subfloor.
What happens to the subfloor once it is bare is covered in subfloor prep: the part of the job you never see.
Carpet and pad
Carpet is the quickest floor to remove. It is cut into strips and rolled, the pad comes up with it, and then the slower part begins: the tack strip around the room edges is pried up and the staples that held the pad are pulled one by one, so the new floor sits on a clean surface.
In older Coulee Region homes, carpet sometimes turns out to be covering original hardwood. That can change the whole plan, because a floor that only needs refinishing is usually the better option than a new one.
If that is what you find, refinish or recoat? covers what a worn hardwood floor can be brought back to.
Floating LVP and laminate
Click-lock floors that float over an underlayment come up quickly. The planks unclick row by row, and the underlayment is rolled up beneath them. Where a floating floor was glued at the edges or trapped under cabinets and trim, it takes longer, but it is still among the easier removals.
Glued-down vinyl and sheet flooring
Glued floors are slow, and the floor itself is the easy part. Once the vinyl is up, the adhesive left behind has to be dealt with, because the new floor needs a clean, flat surface. On a concrete slab, residue is scraped and sometimes ground off. On a wood subfloor, sheet vinyl was often glued to a thin layer of plywood underlayment, and it is usually faster and better to remove the vinyl and that underlayment together and put down fresh underlayment.
Nail-down and glued hardwood
Hardwood that is staying is refinished, not removed. Hardwood that is coming out is taken up board by board, and every nail or staple left in the subfloor is pulled or set flush. Hardwood glued to a slab is slower, because the boards break as they come up and the adhesive stays behind on the concrete.
Tile
Tile is the slowest, loudest and dustiest removal. Tile set over cement board on a wood subfloor usually comes out together with the board. Older homes may have tile set in a thick mortar bed, which is heavy, slow work to break out. Tile removal needs the room sealed off from the rest of the house, with the doorways and any return-air vents in the room covered, because the dust travels.
More than one layer
Older houses often have floors on top of floors: carpet over vinyl over another vinyl over the original boards. Each layer adds height, and often the only way to know how many there are is to cut a small section at the edge of the room. The estimate is the time to look, because three layers take longer to remove than one, and the floor height after removal affects the transitions to the next room.
Older floors and asbestos
Some resilient floor tiles, sheet vinyl backings and the black adhesive used under older floors were made with asbestos, mostly in products from before the 1980s. You cannot tell by looking. Intact and left alone, these materials are low risk. Sanding, scraping, grinding or breaking them up releases fibers, which is the hazard.
- If an old resilient tile or sheet floor, or dark adhesive under one, dates from that era, have a sample tested by an accredited laboratory before any removal starts.
- If it tests positive, removal is work for a licensed asbestos abatement contractor, not a flooring crew. In some cases a new floor can be installed over it instead, leaving it undisturbed, which is worth discussing.
- Do not scrape or sand it yourself to see what is underneath.
This is worth raising at the estimate in any older home, so testing happens before the schedule is set rather than after the floor is half up.
What removal tends to uncover
Once the floor is out, the subfloor tells its own story. The common findings are soft or stained areas around toilets, tubs and dishwashers where water has been getting in, loose sections that explain an old squeak, high and low spots that need leveling, and old patches from previous work. Most of these are routine preparation. Where something needs more than that, such as rotted subfloor, it is shown to you and priced before the new floor goes down.
Loose subfloor found at this stage is the easiest squeak you will ever fix. Squeaky floors: causes and fixes explains why.
Baseboard, trim and doors
Removal usually starts with the shoe molding or quarter round and, depending on the plan, the baseboard. Baseboard that is going back is taken off carefully and labeled by wall. Doors may need to come off their hinges, and some need trimming at the bottom later if the new floor is thicker than the old one.
What happens to the trim is covered in do baseboards come off for new flooring?
Removal belongs on the quote
Removal, hauling and disposal are real labor and real costs, and they vary widely by floor type. Carpet is quick; glued vinyl on a slab or tile over plywood is not. That is why we itemize removal separately on our quotes, so you can see what the old floor is costing to take out. When comparing quotes, check whether removal and disposal are included at all, because a quote that is silent on them cannot be compared with one that includes them.
The other lines to check are in how to compare flooring quotes.
Getting it planned
We handle removal, disposal and subfloor preparation as part of every hardwood, luxury vinyl plank, laminate, carpet and tile installation, and every installation carries our lifetime workmanship warranty. What to expect on installation day covers the rest of the schedule. Book a free in-home estimate and we will check what is under your current floor before we quote.